Question #: 2210

Question: Will you please explain to me how the 8.25% tax are calculated for international orders.

Current Solution

There is no Tax for out of state and international shipments, so we apologize for this presented error.
Please try after a few short minutes, if it continues please contact us directly to resolve the issue.

Respond:

Other Possible Solutions to this Question

  • THEY ARE ASKING FOR THE ACTIVATION CODE AND SERIAL NUMBER USB BOARD. HOW CAN GET THAT INFORMATION?

    To get the activation code, all you need to do is plug the USB board into the computer using a USB cable, go to machine -> firmware -> update. After the firmware is updated the program will present to you a dialog box containing the activation code.

    Additional Information:
    MUAR-QVXU-CAYW-CBWQ


    Additional Information:
    MUIS-RQPB-PTHB-QTTB

    Additional Information:
    MUIH-EERP-IADB-TRIP

    Additional Information:
    9zYWBVf5TxKSK7hEr8gFX3EBw5wa0AMMllQqgftIAnKvZ8DXItLxaPbOB3jWvnpczl/sM/De0scRPHfSxWGmcA==

    Additional Information:
    Key: LUQR-BQYI-SCEW-QVBT

    Additional Information:


    Additional Information:
    after i copy the code in the lower case i recived the same message (more than 8 times) ,, this is a evaluation...,, what i need to do to register properly?

    Additional Information:
    MUJR-BISM-KRDN-KKER
    056971

    Additional Information:
    0561234

    Additional Information:
    MURL-QPQU-EGBJ-FNMB

    Additional Information:
    MUCE-LFMQ-WBCW-MLHO

    Additional Information:


    Additional Information:
    LUTA-ADVJ-FXTW-FBCE

    Additional Information:
    LUTA-ADVJ-FXTW-FBCE

    Additional Information:
    looking for registration key for MUUK-IBTW-ECTL-CJWD

    Additional Information:
    MUXO-PIYY-KNHD-RKLY

    Additional Information:
    MUUE-YYCR-FCIC-VATK

    Additional Information:
    MUUE-YYCR-FCIC-VATK

    Additional Information:


    Additional Information:
    MUEY-YLJU-OBRR-LJBV

    Additional Information:
    MUSP-JFDV-EKGQ-OVLW

    Additional Information:
    MUSP-JFDV-EKGQ-OVLW

    Additional Information:


    Additional Information:


    Additional Information:
    MULY-XRYF-BBDN-FBWP

    Additional Information:


    Additional Information:


    Additional Information:
    how to generate activation code richauto a11

    Additional Information:
    MUJC-LNIL-EOHS-YKNQ

    Additional Information:
    sdfd

    Additional Information:
    m l

    Additional Information:
    MUXC-RWKB-PKAL-HGNN

    Click the link to add information to this solution:
    THEY ARE ASKING FOR THE ACTIVATION CODE AND SERIAL NUMBER USB BOARD. HOW CAN GET THAT INFORMATION?

  • CAN YOU GIVE ME SOME HELP OR POINT IN THE RIGHT DIRECTION TO INCORPORATE MK 7 EXTRUDER WITH BOOK PLANS FOR 3D PRINTER?

    Mounting the extruder to the whiteAnt can be done a couple of ways. One is to take the 4 mounting holes located at the lower portion of the z-axis rail support and use long screws protruding out. Take a thinner material and drill the four holes matching the locations of the 4 screws and screw on nuts to hold it in place. The other option would be to use the metal bracket and fasten to the edge of the rail support.

    Click the link to add information to this solution:
    CAN YOU GIVE ME SOME HELP OR POINT IN THE RIGHT DIRECTION TO INCORPORATE MK 7 EXTRUDER WITH BOOK PLANS FOR 3D PRINTER?

  • WHAT ARE THE BEST FOODS THAT WILL HELP YOU LOSE WEIGHT?

    Lettuce, or any vegetable. Also drink a cup of water before meals, it'll make you feel fuller.

    Click the link to add information to this solution:
    WHAT ARE THE BEST FOODS THAT WILL HELP YOU LOSE WEIGHT?

  • DO NEED TO SQUARE UP THE MACHINE AND IF SO YOU HAVE INSTRUCTIONS OR VIDEO FOR THIS?

    The eyebolts are used in the squaring of the machine. I would use a standard carpenters square and first run the end mill along the edge of the square to first make it parallel with the long axis. Then run the end mill along the other edge with the short axis and adjust the eye bolts and chain according to the angle that the machine is out of square.

    Additional Information:

    Click the link to add information to this solution:
    DO NEED TO SQUARE UP THE MACHINE AND IF SO YOU HAVE INSTRUCTIONS OR VIDEO FOR THIS?

  • IF YOU HAVE CIRCUIT (OR PICTURE) OF HOW THIS RELAY IS CONNECTED TO THE ROUTER
  • HOW MUCH SILICONE TUBE DO I NEED FOR A GREEN LEAN TO CONNECT THE SPINDLE

    The greenlean requires 56 feet of 1/4 Inside Diameter and 3/8 Outside Diameter silicon tube for the spindle.

    Additional Information:
    20

    Additional Information:
    20

    Click the link to add information to this solution:
    HOW MUCH SILICONE TUBE DO I NEED FOR A GREEN LEAN TO CONNECT THE SPINDLE

  • HAVE PORTER CABLE 7518 ROUTER ON MY CNC AND WOULD LIKE TO KNOW IF YOUR ER20 COLLET NUT, FOR THE CABLE, WILL FIT ROUTER.

    Yes, our porter cable collets and nuts will fit the porter cable 7518.

    Additional Information:

    Click the link to add information to this solution:
    HAVE PORTER CABLE 7518 ROUTER ON MY CNC AND WOULD LIKE TO KNOW IF YOUR ER20 COLLET NUT, FOR THE CABLE, WILL FIT ROUTER.

  • WAS WONDERING IF YOU COULD TELL ME WHETHER OR NOT SHIP ANY OF YOUR KIT PRODUCTS TO THE UK?

    You can determine if the area is serviceable by:
    - selecting the items you want to purchase on the website
    - go to the cart (shopping cart top left of any webpage)
    - log in, or register
    - Enter the address and click on calculate shipping.

    The webpage will return the direct rates and whether your area is serviced or not. Feel free to enter any address as long as you are able to receive the package from that address.

    Click the link to add information to this solution:
    WAS WONDERING IF YOU COULD TELL ME WHETHER OR NOT SHIP ANY OF YOUR KIT PRODUCTS TO THE UK?

  • I AM INTERESTED IN THE 3 AXIS COMBO USB OPTION. NOTICE YOU ENDORSE PLANET-CNC FOR USE WITH THIS BUT WILL MACH3 INTERFACE WELL BEAK OUT BOARD?
  • I BOUGHT YOUR BOOK AND WAS HOPEING IT HAD PLANS OR DIMENTIONS ON HOW TO BUILD A CNC HOLD 4X8 SHEET OF PLY. WILL THE IN SCALE UP?

    BYCNC Response:
    The book build was intended to be 20 inches x 40 inches. Larger machines were designed after the book build was introduced so customers would have the option to go bigger than what the book offered. Check out our larger machines on the website as the machines sizes range from 1 foot x 3 feet all the way up to 6 feet x 12+ feet.

    User Response:
    I'm not wanting to spend $3,000+ on a machine, I want to build one that will do a 4x8 sheet of wood. Will the plans in the book scale up?

    BYCNC Response:
    It is possible to scale the book build up, but the rigidity of the gantry would be questionable at that span, even if the height of the gantry structure were to be increased. The gantry design would need to be modified to become a box shape rather than a flat configuration. The kits on the site were design for those wanting a larger machine.

    Click the link to add information to this solution:
    I BOUGHT YOUR BOOK AND WAS HOPEING IT HAD PLANS OR DIMENTIONS ON HOW TO BUILD A CNC HOLD 4X8 SHEET OF PLY. WILL THE IN SCALE UP?

  • I JUST BOUGHT THE 3 AXIS W/HEAVY GANTRY, WILL MACH 4 RUN WELL WITH THIS, AND HOW LARGE CAN GO CUT AREA

    Yes Mach3 is a great program. Our 3 axis is 6'X12'X3'using all BYCNC components (incl. redsprout)

    Click the link to add information to this solution:
    I JUST BOUGHT THE 3 AXIS W/HEAVY GANTRY, WILL MACH 4 RUN WELL WITH THIS, AND HOW LARGE CAN GO CUT AREA

  • WHICH OF OUR PEDIATRIC PATIENTS WILL NEED 2 DOSES INFLUENZA VACCINE FOR THE 2011–12 VACCINATION SEASON?

    ACIP's influenza recommendations for children age 6 months through 8 years have changed for the 2011–12 season. According to the new algorithm, certain children need 2 doses of influenza vaccine this influenza season, separated by at least 4 weeks. Here is a summary:

    • Children age 6 months through 8 years who did not receive AT LEAST 1 dose of the 2010–11 vaccine should receive 2 doses, separated by at least 4 weeks, REGARDLESS of their previous influenza vaccination history.
    • Children age 6 months through 8 years whose influenza vaccination status from the previous season is not known should also receive 2 doses at least 4 weeks apart.
    • Children age 6 months through 8 years who received 1 dose of seasonal influenza vaccine during the 2010–11 season need ONLY 1 dose this season. This is because the vaccine strains are the same this season as last season.

    You may find this Immunization Action Coalition handout helpful: www.immunize.org/catg.d/p3093.pdf.

    Click the link to add information to this solution:
    WHICH OF OUR PEDIATRIC PATIENTS WILL NEED 2 DOSES INFLUENZA VACCINE FOR THE 2011–12 VACCINATION SEASON?

  • I'VE BUFFERED A PWM SIGNAL TO 0-10V ANALOG AND I WOULD LIKE USE THAT RUN YOUR 110V 2.2KW SPINDLE VFD. COULD YOU PLEASE DETAIL THE CORRECT WIRING VFD SETTINGS GET WORKING?

    This will depend on the VFD you have to identify the correct terminal. The terminal on the VFD will be labeled AI1 typically (Analog Input #1). You will also need to make sure to complete the PWM circuit using the GND terminal on the VFD.

    Additional Information:
    I have wired my 0-10V signal to the AI1 and GND terminals as suggested. I have also set the PD-01 and PD-02 settings to 1. Still nothing. Is there something else that I am missing?

    Additional Information:
    Thanks for the information. Can you let me know the model of the VFD that you have?

    Additional Information:
    VFD Model # YL600-2S-2K20

    Additional Information:
    Thanks. I will check our resources and documentation to see if there is another programming setting that needs to be changed.

    Additional Information:
    Does your VFD have a VI terminal?

    Additional Information:
    No, it does not. The terminals for this VFD are as follows (seperated by dashes "-").

    10V-AI1-AO2-PLC-DI5-DI3-DI1-COM
    AI2-GND-AO1-DI6-DI4-DI2-FM-24V

    Additional Information:
    Do you have a PD070 parameter?

    PD070 is the main Analog Input parameter.

    The options for that parameter is:
    0: 0-10V
    1: 0-5V
    2: 0-20mA
    3: 4-20mA
    4: 0-10V (4-20mA Stacked)
    5: XIA
    6: (VI+XIA)/2
    7: (3VA+XIA)/4
    8: (XIA_XIB)/2
    9: Max (XIA, XIB)
    10: Min (XIA, XIB)


    Additional Information:
    There is a PD-00 thru PD-09. PD-07 is currently set to 0.

    Additional Information:
    It appears that the manual I’m using “Titled YL600” is not the same as your unit. I will check our manuals and find the one that has only PD-00 to PD-09.

    Additional Information:
    For that VFD, the parameters are P0. The 0 may look like a D on the display.

    The parameters that need to be changed for the AI1 to work (Brackets [] around the correct selection):

    P0-01: First Motor Control Mode
    - 0: Sensorless Vector Control
    - 1: Flux Vector Control (FVC)
    - [2]: V/F Control

    P0-02: Options of Command Source
    - 0: Operation Panel Command Channel (LED will be off)
    - [1]: Terminal Command Channel (LED will be on)
    - 2: Communication Command Channel (LED will flicker)

    P0-03: Options of Principle Frequency Source X
    - 0: Digital Setting (Preset Frequency P0-08, UP/DOWN modifiable, no power-down memory)
    - 1: Digital Setting (Preset Frequency P0-08, UP/DOWN modifiable, with power-down memory)
    - [2]: AI1
    - 3: AI2
    - 4: AI3
    - 5: Pulse Setting (DI5)
    - 6: Multi Speed Instruction
    - 7: Simple PLC
    - 8: PID (Proportional Integral Derivative Control)
    - 9: Communication Given

    P0-11: Upper Limit Frequency Source
    - 0: P0-12 (Make sure the P0-12 parameter has the correct max frequency if used)
    - [1]: AI1
    - 2: AI2
    - 3: AI3
    - 4: Pulse Setting
    - 5: Communication Given

    P0-27: Command Source Bundle with Frequency Sources
    Single Digit: Options of Operation Panel Command Bundle with Frequency Sources
    - 0: No Bundling
    - 1: Digital Setting Frequency
    - [2]: AI1
    - 3: AI2
    - 4: AI3
    - 5: Pulse Setting (DI5)
    - 6: Multi Speed Instruction
    - 7: Simple PLC
    - 8: PID
    - 9: Communication Given
    Double Digit: Options of Terminal Command Bundle with Frequency Sources
    Hundred Place: Options of Communication Command Bundle with Frequency Sources
    Kilobit: Options of Automatic Operation Bundle with Frequency Sources

    P2-09: Upper Limit Source of Lower Torque Under Speed Control Mode
    - 0: Function Code P2-10 Setting
    - [1]: AI1
    - 2: AI2
    - 3: AI3
    - 4: Pulse Setting
    - 5: Communication Given
    - 6: MIN (Al1, Al2)
    - 7: MAX (Al1, Al2)
    - Maximum range for options 1-7, accords with P2-10

    If you elect to use a different AI#, then configure the parameters (P0-03, P0-11, P0-27 and P2-09) accordingly.

    Click the link to add information to this solution:
    I'VE BUFFERED A PWM SIGNAL TO 0-10V ANALOG AND I WOULD LIKE USE THAT RUN YOUR 110V 2.2KW SPINDLE VFD. COULD YOU PLEASE DETAIL THE CORRECT WIRING VFD SETTINGS GET WORKING?

  • FIRST OF ALL, THANKS FOR DESIGNING A WONDERFUL SITE. MY QUESTION IS: HOW DO YOU CALCULATE EME (ELECTROMAGNETIC EMISSIONS) AROUND THE TRANSMITTER (ANTENNA) AT ANY GIVEN POINT AND WHAT ARE MEASURES TO KEEP IT UNDER SAFETY CODE?

    Conceptually it is straightforward to predict the radiofrequency (RF) exposure intensity at any point in the vicinity of a cellular radio base station antenna. Simply multiply the effective radiation power times the inverse square of the distance times the relative gain of the antenna in the direction of the interest. The relative gain in different directions is know as the antenna radiation pattern and is usually available from the antenna manufacturer in graphical or tabular form.

    Unfortunately, in real life the calculations involved in base station antenna evaluations are quite complex and require expert knowledge and experience to deal with the many parameters that are involved. An excellent reference summarizing this process is the Federal Communications Commission OET Bulletin No. 65 titled "Evaluating Compliance With FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields," available on the Federal Communications Commission (FCC) website.

    To assess the RF hazards associated with handheld cell phones it is necessary to predict the rate of absorption in the body of radiofrequency energy, a parameter called the specific absorption rate (SAR). This is a very complex calculation, and cell phone manufacturers often rely on measurements of SAR in fluid-filled cylinders or plastic containers in the shape of a head. The FCC requires cell phone manufacturers to provide this data to FCC. You can obtain the data for your model phone on the the FCC's website. Unfortunately only cell phones manufactured in the last couple years are listed here.

    As to your question about keeping RF exposures within the safety code, please read the other questions posted on this website this matter. Cellular radio products that meet FCC requirements will be within the guidelines established by safety standards organizations for users' and public exposure to RF radiation fields.

    Gary H. Zeman, ScD, CHP

    Click the link to add information to this solution:
    FIRST OF ALL, THANKS FOR DESIGNING A WONDERFUL SITE. MY QUESTION IS: HOW DO YOU CALCULATE EME (ELECTROMAGNETIC EMISSIONS) AROUND THE TRANSMITTER (ANTENNA) AT ANY GIVEN POINT AND WHAT ARE MEASURES TO KEEP IT UNDER SAFETY CODE?

  • ARE THERE RECOMMENDATIONS FOR THE PREVENTION OF INSTITUTIONAL OUTBREAKS INFLUENZA?

    The most important factor in preventing outbreaks is annual vaccination of all occupants of the facility, and all persons in the facility who share the same air as the high-risk occupants. Groups that should be targeted include physicians, nurses, and other personnel in hospitals and outpatient settings who have contact with high-risk patients in all age groups, and providers of home care to high-risk persons (e.g., visiting nurses, volunteers).

    Click the link to add information to this solution:
    ARE THERE RECOMMENDATIONS FOR THE PREVENTION OF INSTITUTIONAL OUTBREAKS INFLUENZA?

  • HAVE CAD FILES (.DWG AND .DWF) FOR THE GUITARS. HOW DO LOAD THEM INTO PLANT CNC SOFTWARE USE?

    You will need a cam program to create machining operations for the geometry in the .dwg file. The CAM program outputs these machining operations into g-code for the control program (planet-cnc) to use.

    I have a couple of tutorials that explain this concept.
    http://www.buildyourcnc.com/tutorials/Tutorial-sketchup-fabrication-fabricate-cad-cam-dxf

    The following is an older video but get's the point across:
    http://www.buildyourcnc.com/process1.aspx

    Additional Information:

    Click the link to add information to this solution:
    HAVE CAD FILES (.DWG AND .DWF) FOR THE GUITARS. HOW DO LOAD THEM INTO PLANT CNC SOFTWARE USE?

  • HOW DO I WIRE THE 4TH AXIS THAT YOU SELL. I HAVE MACH3 SOFTWARE. NO INSTRUCTIONS ON YOUR SITE

    The motor that is attached to the 4th axis is wired as follows:

    The motor should have red, green yellow and blue wires coming form the motor. The red and green are paired as one coil and the yellow and blue is paired as the other coil. You can wire the motor to a 3.0 amp driver with red to A+, green to A-, Yellow to B+ and Blue to B-

    Click the link to add information to this solution:
    HOW DO I WIRE THE 4TH AXIS THAT YOU SELL. I HAVE MACH3 SOFTWARE. NO INSTRUCTIONS ON YOUR SITE

  • HOW DO YOU HOOK UP THE SPINDLE TO INVERTER?

    U - Pin1
    V - Pin2
    W - Pin3
    Pin4 Dead

    Additional Information:
    My home made cnc is a big problem with my NC connection. When in start my spindle it will be gone wrong. It will be limith switch problem anytime. Need help thanks.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    HOW DO YOU HOOK UP THE SPINDLE TO INVERTER?

  • WHERE ARE THE WIRING DIAGRAMS FOR BLACKTOOTH LASER CUTTER IN INSTRUCTIONS?

    You can find the wiring diagrams for the blackTooth on step 105 and 106 on the list of instructions on the blackTooth page. Step 105 pertains to the parallel breakout board and step 106 pertains to the USB interface board.

    Additional Information:
    wire size

    Click the link to add information to this solution:
    WHERE ARE THE WIRING DIAGRAMS FOR BLACKTOOTH LASER CUTTER IN INSTRUCTIONS?

Get Help with:
This Product
Orders
Tech Support
Sales
This Product
Order Query
Tech Support
Sales
Not logged in. Log In Register
Track Order(s)
View Order(s)
I Want to Schecule a One-On-One Paid Tech Support Session
Book an Appointment Pertaining to a BuildYourCNC Product (Free)
Ask a Quesion Below (Free):
Book an Appointment Pertaining Other Equipment ($60/half hour)
Book an Immedite Appointment Pertaining Other Equipment ($120/half hour)
Ask a Quesion Below (Free):
Waiting for response... I may not answer immediately, but I was notified on my cellular phone so my response is forthcoming. If I don't respond immediately, you can always go to the [My Account] page to see all of our chats at any time.