Question #: 14554

Question: Hello, After watching the tutorial to set up my spindle in Mach3, My outputs are not working. Any help would be appreciated. Just Simple on/off.

Current Solution

I created a video that demonstrates the wiring and Mach3 configuration for the Mach3 USB controller. It is the last video on the following webpage:
https://www.buildyourcnc.com/item/electronicsAndMotors-electronic-component-breakout-Mach3-USB-Board

If you have a different controller, let me know and I can provide further inforatmion.

Respond:

Other Possible Solutions to this Question

  • IF I PURCHASE A GREENBULL 6X LONG Z CNC MACHINE KIT AND MACH3, WHAT ELSE WOULD BE REQUIRED TO ASSEMBLE THE WORKING MACHINE? HAVE CAD SOFTWARE.

    You will need to build the table unit for your machine. There are instructions on how to do this at the bottom of the product page here, https://www.buildyourcnc.com/Item/cnc-machine-blackFoot-v4
    There is no estimate on how much this will cost though, since there are too many variables involved to do this.

    - PC with parallel port and USB port
    - 20awg stranded wires for the motors - http://www.buildyourcnc.com/electronicscombo.aspx
    - 18awg stranded wires for power supply to drivers
    - 24awg stranded wires for breakout board to drivers
    (location and spacing of components varies from one person to another, so we do not provide cables/wires)
    - General purpose extension cord (cut the female end off) to provide power to power supply
    - USB cable to power breakout board
    - Parallel cable to communicate to breakout board
    - Router
    - (optional - instead of router) Spindle with power inverter http://www.buildyourcnc.com/SpindlesAndAccessories.aspx
    - (if purchasing spindle with inverter) General purpose extension cord (240v) (cut the female end off) to provide power to power inverter
    - End Mill(s) http://www.buildyourcnc.com/ProductsEndMills.aspx
    - CAD, and/or CAD-CAM software (to produce geometry, machine operations, and g-code) http://www.buildyourcnc.com/CNCsoftware.aspx
    - CNC control software (to read g-code and control machine) http://www.buildyourcnc.com/CNCsoftware.aspx

    This answer is applicable to most of our machines with the exception of the greenLean and the blueChick since those machines are equipped with a table structure.

    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    IF I PURCHASE A GREENBULL 6X LONG Z CNC MACHINE KIT AND MACH3, WHAT ELSE WOULD BE REQUIRED TO ASSEMBLE THE WORKING MACHINE? HAVE CAD SOFTWARE.

  • I'VE BUFFERED A PWM SIGNAL TO 0-10V ANALOG AND I WOULD LIKE USE THAT RUN YOUR 110V 2.2KW SPINDLE VFD. COULD YOU PLEASE DETAIL THE CORRECT WIRING VFD SETTINGS GET WORKING?

    This will depend on the VFD you have to identify the correct terminal. The terminal on the VFD will be labeled AI1 typically (Analog Input #1). You will also need to make sure to complete the PWM circuit using the GND terminal on the VFD.

    Additional Information:
    I have wired my 0-10V signal to the AI1 and GND terminals as suggested. I have also set the PD-01 and PD-02 settings to 1. Still nothing. Is there something else that I am missing?

    Additional Information:
    Thanks for the information. Can you let me know the model of the VFD that you have?

    Additional Information:
    VFD Model # YL600-2S-2K20

    Additional Information:
    Thanks. I will check our resources and documentation to see if there is another programming setting that needs to be changed.

    Additional Information:
    Does your VFD have a VI terminal?

    Additional Information:
    No, it does not. The terminals for this VFD are as follows (seperated by dashes "-").

    10V-AI1-AO2-PLC-DI5-DI3-DI1-COM
    AI2-GND-AO1-DI6-DI4-DI2-FM-24V

    Additional Information:
    Do you have a PD070 parameter?

    PD070 is the main Analog Input parameter.

    The options for that parameter is:
    0: 0-10V
    1: 0-5V
    2: 0-20mA
    3: 4-20mA
    4: 0-10V (4-20mA Stacked)
    5: XIA
    6: (VI+XIA)/2
    7: (3VA+XIA)/4
    8: (XIA_XIB)/2
    9: Max (XIA, XIB)
    10: Min (XIA, XIB)


    Additional Information:
    There is a PD-00 thru PD-09. PD-07 is currently set to 0.

    Additional Information:
    It appears that the manual I’m using “Titled YL600” is not the same as your unit. I will check our manuals and find the one that has only PD-00 to PD-09.

    Additional Information:
    For that VFD, the parameters are P0. The 0 may look like a D on the display.

    The parameters that need to be changed for the AI1 to work (Brackets [] around the correct selection):

    P0-01: First Motor Control Mode
    - 0: Sensorless Vector Control
    - 1: Flux Vector Control (FVC)
    - [2]: V/F Control

    P0-02: Options of Command Source
    - 0: Operation Panel Command Channel (LED will be off)
    - [1]: Terminal Command Channel (LED will be on)
    - 2: Communication Command Channel (LED will flicker)

    P0-03: Options of Principle Frequency Source X
    - 0: Digital Setting (Preset Frequency P0-08, UP/DOWN modifiable, no power-down memory)
    - 1: Digital Setting (Preset Frequency P0-08, UP/DOWN modifiable, with power-down memory)
    - [2]: AI1
    - 3: AI2
    - 4: AI3
    - 5: Pulse Setting (DI5)
    - 6: Multi Speed Instruction
    - 7: Simple PLC
    - 8: PID (Proportional Integral Derivative Control)
    - 9: Communication Given

    P0-11: Upper Limit Frequency Source
    - 0: P0-12 (Make sure the P0-12 parameter has the correct max frequency if used)
    - [1]: AI1
    - 2: AI2
    - 3: AI3
    - 4: Pulse Setting
    - 5: Communication Given

    P0-27: Command Source Bundle with Frequency Sources
    Single Digit: Options of Operation Panel Command Bundle with Frequency Sources
    - 0: No Bundling
    - 1: Digital Setting Frequency
    - [2]: AI1
    - 3: AI2
    - 4: AI3
    - 5: Pulse Setting (DI5)
    - 6: Multi Speed Instruction
    - 7: Simple PLC
    - 8: PID
    - 9: Communication Given
    Double Digit: Options of Terminal Command Bundle with Frequency Sources
    Hundred Place: Options of Communication Command Bundle with Frequency Sources
    Kilobit: Options of Automatic Operation Bundle with Frequency Sources

    P2-09: Upper Limit Source of Lower Torque Under Speed Control Mode
    - 0: Function Code P2-10 Setting
    - [1]: AI1
    - 2: AI2
    - 3: AI3
    - 4: Pulse Setting
    - 5: Communication Given
    - 6: MIN (Al1, Al2)
    - 7: MAX (Al1, Al2)
    - Maximum range for options 1-7, accords with P2-10

    If you elect to use a different AI#, then configure the parameters (P0-03, P0-11, P0-27 and P2-09) accordingly.

    Click the link to add information to this solution:
    I'VE BUFFERED A PWM SIGNAL TO 0-10V ANALOG AND I WOULD LIKE USE THAT RUN YOUR 110V 2.2KW SPINDLE VFD. COULD YOU PLEASE DETAIL THE CORRECT WIRING VFD SETTINGS GET WORKING?

  • MY LASER MACHINE VERTICAL DOES NOT ACTIVATE THE LASER TUBE, VERIFY THE POWER SUPPLIES AND THEY ARE WORKING WHICH THE PROBLEM CAN BE

    Same issue here -- TTL output from the AWC708C never seems to be pulled low. Still troubleshooting.

    Click the link to add information to this solution:
    MY LASER MACHINE VERTICAL DOES NOT ACTIVATE THE LASER TUBE, VERIFY THE POWER SUPPLIES AND THEY ARE WORKING WHICH THE PROBLEM CAN BE

  • How can we check our 1.5kw spindle. we get a dL error after we start to cut. it spins up fine. We checked IGBTs in the VFD and they're not shorted. We suspect intermittent short INSIDE the spindle. What do you think?

    dL usually stand for a short that is occurring within the spindle or spindle wiring. I would recheck the wiring going from the VFD to the spindle, as well as the terminal on the spindle where there should've been some soldering required. We usually tend to either heat shrink or use electrical tape to cover the terminals so no contact or arching can be present.

    Also depending on the VFD you have please adjust the setting pd008, to the voltage that is required (110V/220V).

    If the issue proceeds please contact use at customerservice@buildyourcnc.com, for further assistance or replacement.

    Click the link to add information to this solution:
    How can we check our 1.5kw spindle. we get a dL error after we start to cut. it spins up fine. We checked IGBTs in the VFD and they're not shorted. We suspect intermittent short INSIDE the spindle. What do you think?

  • I JUST RECEIVED A REPLACEMENT SPINDLE (2.2KW 220V). HOWEVER, WHEN ATTEMPTED IT USE THE NEW SPINDLE, WOULD ONLY REACH 1500 RPM. IS THERE SOMETHING NEED TO CHANGE ON CONTROLLER?

    VFD settings........
    1) To program the VFD, wire it up, plug it in. It takes several seconds to come to life.

    2) Push the PRGM button to enter programing mode.

    3 )Push the SET button. The display will read PD000.

    4) If you push the SET button again, it will display the present setting of PD000.

    5 )By pushing the up or down arrows, you can change the setting to whatever it needs to be. (This is just an example. PD000 needs no changes)

    6)Push the SET button again to lock in the setting of PD000 and advance to the next number, in this case, PD001.

    7) Push the SET button and it will display the present setting of PD001. Again, use the up and down arrows as necessary to set PD001, then push SET again to lock it in.

    Note: You can also scroll through the PD numbers with the up and down arrows.

    8) make all settings this way.

    9) by pushing the SET button you can scroll through the settings. First push of SET moves to the next number, second push displays it's setting, third push moves to the next PD number.

    Note- If you take too long, it will leave the programing mode on it's own. If it does, just push PRGM again to return to programing mode. Then press SET and continue what you were doing.

    10) Start with PD013. Set it to 1, which returns the settings to the factory settings.

    11) Then set PD005 to 400, PD004 to 400, and PD003 to 400 IN THAT ORDER.

    12) Then set the following: PD041=8, PD144=3000

    13) Set PD209=50

    That's it for the programing. You should get 24000RPM when you push RUN.

    Click the link to add information to this solution:
    I JUST RECEIVED A REPLACEMENT SPINDLE (2.2KW 220V). HOWEVER, WHEN ATTEMPTED IT USE THE NEW SPINDLE, WOULD ONLY REACH 1500 RPM. IS THERE SOMETHING NEED TO CHANGE ON CONTROLLER?

  • Hi my names is Minh Truong I would like to said thank you very much for your video I got the system mach3 working fine but one thing I can NOT set and config the digitizer on the board IN4 I am not sure how to setup because in the Mach3 pin 14 for digitizer Please shoe me hoe to set it up for the digitizer.
  • AM NOT SURE HOW TO SET THE Z AXIS TURN ON/OFF LASER WHEN CREATE CODE. KNOW THAT ITS TYPICALLY Z-AXIS MOVEMENT DOES THIS - BUT YOU DONT SHOW ANYTHING HOOKED UP IN PLACE OF AXIS.

    When the z axis is going down, the laser turns on. When the z axis is going up, it turns off. The z axis directions is only a signal that is either 5v or 0v. That determines the direction. In vectric, you will need to set your machining operations with a very very small depth so the time it takes to get to its final depth is a very short time.

    Click the link to add information to this solution:
    AM NOT SURE HOW TO SET THE Z AXIS TURN ON/OFF LASER WHEN CREATE CODE. KNOW THAT ITS TYPICALLY Z-AXIS MOVEMENT DOES THIS - BUT YOU DONT SHOW ANYTHING HOOKED UP IN PLACE OF AXIS.

  • I have the 2.2 kW spindle and VFD for 110v, just wondering what amperage this draws, as my electricain buddy is telling me I need to put in a 20 amp breaker for this. I cant seem to find any amerpage draw on the INPUT label

    You can actually set a current limit in in the VFD using the programming process and the specifications in the manual that came with your VFD. You can expect the spindle at 220 Volts AC to draw (using the standard formula):

    For Volts, I will use 230 as the range is generally 220 to 240.

    Watts = Current * Volts

    Can also be written as:

    Current = Watts / Volts

    Current = 2.2kW (2200 watts) / 230 volts

    Current = 9.6 amps

    Click the link to add information to this solution:
    I have the 2.2 kW spindle and VFD for 110v, just wondering what amperage this draws, as my electricain buddy is telling me I need to put in a 20 amp breaker for this. I cant seem to find any amerpage draw on the INPUT label

  • I AM CURRENTLY HAVING SOME PROBLEM SQUARING THE GANTRY AND MY STEPS PER INCH ARE NOT 1422.22 ACCORDING TO YOUR CALCULATIONS IN AUTO SET UP THEY COME OUT LIKE 1416.#### THIS A BIG DEAL?

    Your steps per inch will vary. I suggest watching my calibration video.

    Click the link to add information to this solution:
    I AM CURRENTLY HAVING SOME PROBLEM SQUARING THE GANTRY AND MY STEPS PER INCH ARE NOT 1422.22 ACCORDING TO YOUR CALCULATIONS IN AUTO SET UP THEY COME OUT LIKE 1416.#### THIS A BIG DEAL?

  • I PURCHASED A VFD AND SPINDLE FROM FRIEND, HIS SET UP IS 220. DON'T HAVE 220 IN MY SHOP. QUESTION CAN USE YOUR 110 WITH THIS SPINDLE??

    Depending if the spindle can work with this specific VFD, it might be possible. However we would not like to risk you working unit, with a possible match so we would like more details on your specific model and any information available on the spindle itself.

    Response
    The only info on the spindle is 2.2KW 400HZ 220V. Made by Zhong Hua Jiang.

    Was originally on a Delta C200 vfd. That is 220 single phase.

    Click the link to add information to this solution:
    I PURCHASED A VFD AND SPINDLE FROM FRIEND, HIS SET UP IS 220. DON'T HAVE 220 IN MY SHOP. QUESTION CAN USE YOUR 110 WITH THIS SPINDLE??

  • USING MACH3, MY MACHINE STOPS IN THE MIDDLE OF A PROJECT. HOW CAN IT BE STARTED AGAIN FROM POINT STOPPED?

    Dealing with a mid-stop cut via Mach3, you will have to be careful if it is intentionally or unintentional. If you desire to stop your machine while in the middle of a cut be sure to stop it when the machine is moving in an upward motion on the z-axis and the X/Y-axis are stationary. Then you can choose the point (G-code) where the machine was left off and click on the Run from here button on the Program Run screen (left hand side) right above the Reset button.
    (Make sure spindle/router is running before hand!)

    Now if the machine stops unintentionally, and was moving in either the X/Y-axis, then it will be difficult to run the machine from the original point dealing with the coordinates might have been lost due the the machine continuing motion but via Mach3 the machine has stopped.

    If this occurs to fight this issue before hand, is marking your home with the spindle/router to make a hole were your home is. Although moving it manually back to home the machine can be off by the smallest amount and could cause an inconsistent cut. If accuracy is something that can not be risked, then you can home the machine about a 1/4" or 1/2" down from the original home to start your cut on the same material but loosing that small piece.

    Additional Information:


    Additional Information:
    My typical go to solution is:

    - Note the current g-code line where the machine stopped.
    - If Mach3 errored and you cannot control the machine, Exit Mach3 - you may find that reset, stop does nothing to stop the spindle. When you exit mach3, the spindle will stop automatically.
    - Restart Mach3. The DRO (Digital Readout) should show the correct coordinates where the machine position was before exiting Mach3.
    - Scroll to the g-code line where the machine stopped. You may need to go a few lines prior to make sure you are not skipping any machining operations (which is why it is a good idea to learn the basics of g-code - don't worry, it's easy)
    - Click on the "Run from Here" button.
    - Mach3 will present you with a "Preparation Move" dialog box with the location that it will move to. If the coordinates shows a position that is into the material, make sure to specify a rapid height (clearance height) so the machine will move up first and then move to the location before moving down into the material. If the spindle is automatically controlled by Mach3, make sure to check the turn spindle on checkbox. If not, make sure the router or spindle is on before clicking OK.

    Additional Information:
    My cnc router stops at gcode line 50,000 and cannot finish program. They are about 150k of lines total. I have Mach3 and have bought the additional line capability. Is 50,000 (or around that) the limit? Is Mach 4 hobby license better and in what ways? Thanks! Mike Huber

    Additional Information:
    If you have a license for Mach3, then you should be able to run g-code indefinitely. I think there is something else going on.

    Additional Information:
    Additional Information:
    If you have a license for Mach3, then you should be able to run g-code indefinitely. I think there is something else going on.
    What else could be going on?

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:
    41PBGevE

    Additional Information:
    -1 OR 2+358-358-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    -1' OR 2+902-902-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+902-902-1=0+0+0+1 --

    Additional Information:
    -1' OR 2+730-730-1=0+0+0+1 or 'Qb1SuH5C'='

    Additional Information:
    -1" OR 2+161-161-1=0+0+0+1 --

    Additional Information:
    -1 OR 2+69-69-1=0+0+0+1

    Additional Information:
    if(now()=sysdate(),sleep(15),0)

    Additional Information:
    0'XOR(if(now()=sysdate(),sleep(15),0))XOR'Z

    Additional Information:
    0"XOR(if(now()=sysdate(),sleep(15),0))XOR"Z

    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:
    (select(0)from(select(sleep(9)))v)/*'+(select(0)from(select(sleep(9)))v)+'"+(select(0)from(select(sleep(9)))v)+"*/

    Additional Information:
    (select(0)from(select(sleep(15)))v)/*'+(select(0)from(select(sleep(15)))v)+'"+(select(0)from(select(sleep(15)))v)+"*/

    Additional Information:
    -1; waitfor delay '0:0:15' --

    Additional Information:
    -1; waitfor delay '0:0:19' --

    Additional Information:
    -1); waitfor delay '0:0:15' --

    Additional Information:
    -1)); waitfor delay '0:0:15' --

    Additional Information:
    1 waitfor delay '0:0:15' --

    Additional Information:
    O6enxjIS'; waitfor delay '0:0:15' --

    Additional Information:
    0MgObbnm'); waitfor delay '0:0:15' --

    Additional Information:
    8dan23Sv')); waitfor delay '0:0:15' --

    Additional Information:
    -5 OR 898=(SELECT 898 FROM PG_SLEEP(15))--

    Additional Information:
    -5 OR 353=(SELECT 353 FROM PG_SLEEP(19))--

    Additional Information:
    -5) OR 539=(SELECT 539 FROM PG_SLEEP(15))--

    Additional Information:
    -1)) OR 919=(SELECT 919 FROM PG_SLEEP(15))--

    Additional Information:
    xjpbAodW' OR 81=(SELECT 81 FROM PG_SLEEP(15))--

    Additional Information:
    r6v9pPjr') OR 551=(SELECT 551 FROM PG_SLEEP(15))--

    Additional Information:
    RDopsUKk')) OR 996=(SELECT 996 FROM PG_SLEEP(15))--

    Additional Information:

    *DBMS_PIPE.RECEIVE_MESSAGE(CHR(99)||CHR(99)||CHR(99),15)

    Additional Information:

    '||DBMS_PIPE.RECEIVE_MESSAGE(CHR(98)||CHR(98)||CHR(98),15)||'

    Additional Information:
    1'"

    Additional Information:
    1����%2527%2522

    Additional Information:
    @@HCYaP

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    USING MACH3, MY MACHINE STOPS IN THE MIDDLE OF A PROJECT. HOW CAN IT BE STARTED AGAIN FROM POINT STOPPED?

  • I NEED HELP IN GATHERING PUBLISHED INFORMATION ABOUT THE RISKS POSED BY CELL TOWERS PLACED ON SCHOOL GROUNDS. THERE WHICH WOULD ENABLE ME TO GATHER/CALCULATE OR MEASURE RADIATION SPECIFIC SITE?

    The best single reference is the Federal Communications Commission (FCC) Website. Look for:
    Bulletin 56, "Questions and Answers about Biological Effects and Potential Hazards of Radiofrequency Electromagnetic Fields,"

    Bulletin 65, "Evaluating Compliance With FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields,"

    "A Local Government Official's Guide to Transmitting Antenna RF Emission Safety: Rules, Procedures, and Practical Guidance."
    An excellent technical paper with field measurements of cell-tower emissions was published by R.C. Petersen and P.A. Testagrossa in the journal Bioelectromagnetics, volume 13, page 527ff, 1992. If you need onsite technical support and services there are various consultants available, such as Richard Tell Associates, Inc. Gary Zeman, ScD, CHP Lawrence Berkeley National Laboratory

    Click the link to add information to this solution:
    I NEED HELP IN GATHERING PUBLISHED INFORMATION ABOUT THE RISKS POSED BY CELL TOWERS PLACED ON SCHOOL GROUNDS. THERE WHICH WOULD ENABLE ME TO GATHER/CALCULATE OR MEASURE RADIATION SPECIFIC SITE?

  • [575] I have finally got my limit switches wired and working - thank you. Can they also used as homing switches and if so it it just a question of looping the two inputs on the board i.e. the limit and home terminals IN2 to IN3

    You will want to connect the homing switches (which may also serve as your near limit switches) to different input terminals. It's ok to add more limit switches with the home switches, but each home should be on independent inputs. For example, connect home X and any other limit switch to IN1, connect home Y and any other limit switch to IN2, and so on. This will allow you to properly use the "ref all home" button in Mach3.

    Additional Information:


    Additional Information:
    In the instructions (diagram 1) you show all the home switches connected in parallel? But here you say they need to each have their own inputs. "You will want to connect the homing switches (which may also serve as your near limit switches) to different input terminals." I dont see how the second and third axis can go home if the first axis has already closed the parallel circuit unless they back off a bit until the switch opens up again before the next axis goes to home? My machine has no limit switches so I assume they are home switches.

    Click the link to add information to this solution:
    [575] I have finally got my limit switches wired and working - thank you. Can they also used as homing switches and if so it it just a question of looping the two inputs on the board i.e. the limit and home terminals IN2 to IN3

  • IT POSSIBLE TO BUY THE CAD FILES FOR BLACK FOOT MACHINE, MECHANICAL PARTS AND ELECTRONICS BUT NOT WOODEN PARTS, SAVE SHIPPING COSTS? IN THAT CASE I WOULD INSTRUCT SOMEONE MILL ME.

    The files and hardware option for our machines has been removed from the site due to the following reasons:
    Difficulty for the end use of the files and the challenges (and time/money) on our side to assist in using these files.
    The abuse of these files over the internet.
    Ultimately may reduce the sales of machines keeping us in business.
    Sadly, this is what has come out of our company attempting to be open; however, the machines sold on this site is still far lower in price than the competition for the quality that we provide as we have a great desire to engender the cottage industry to fulfill their need for low end manufacturing. My sincere apologies if this causes any inconvenience.

    Additional Information:
    NO, is not possible, I can help with the shipping cost

    Additional Information:

    Click the link to add information to this solution:
    IT POSSIBLE TO BUY THE CAD FILES FOR BLACK FOOT MACHINE, MECHANICAL PARTS AND ELECTRONICS BUT NOT WOODEN PARTS, SAVE SHIPPING COSTS? IN THAT CASE I WOULD INSTRUCT SOMEONE MILL ME.

  • I HAVE NOT SEEN ANY REFERENCES TO ENCODER FEED-BACK CAPABILITY IN OF THE HARDWARE YOU SELL. THIS A SUPPORTED FEATURE WITH HARDWARE/SOFTWARE SELL?

    I haven't delved into using encoders with stepping motors too much. From my research, you need to have a controller that can provide the closed loop control, rather than software handling that process. I have also found from my research that using encoders on stepping motors is generally used to stop the machine in the case that the motor failed to achieve the commanded position for some reason and gives the user the chance to correct and continue with the job.

    If you want proper closed loop control, it may be best to go with servos and servo controller that provide the closed loop control within the real of those two components.

    Click the link to add information to this solution:
    I HAVE NOT SEEN ANY REFERENCES TO ENCODER FEED-BACK CAPABILITY IN OF THE HARDWARE YOU SELL. THIS A SUPPORTED FEATURE WITH HARDWARE/SOFTWARE SELL?

  • I have the 2.2KW VFD. I would like to have it controlled through software. What are the Mode parameters that need to be changed that will allow FWD/ REV, START/STOP and RPM control?

    What controller are you using to control the cnc machine (Mach3 usb, parallel breakout board, etc.)?

    The spindle VFD has an input for 0-10 volts to control the speed and can be used with the MAch3 USB or the Pokeys57CNC board. There are also other terminals in the VFD to control the forwared/reverse and start and stop. Mach3 has parameters to control these output and you need to specify which pins are used for these.

    You can also use the TX/RX RS-485 connection on the VFD to have total control using an FTDI USB to serial connector board to connect the computer directly to the VFD.

    How to connect the USB to Serial adapter to the VFD:
    https://www.buildyourcnc.com/FAQ/13790

    FTDI USB to Serial:
    https://www.buildyourcnc.com/item/Interfaces-newbiehack-Interfaces-TTL232R-USB-UART-Serial

    Pokeys57CNC board:
    https://www.buildyourcnc.com/item/electronicsAndMotors-electronic-component-breakout-Mach4-mach3-USB-ethernet-Board

    Mach3 USB board:
    https://www.buildyourcnc.com/item/electronicsAndMotors-electronic-component-breakout-Mach3-USB-Board

    Parallel Breakout board:
    https://www.buildyourcnc.com/item/electronicsAndMotors-parallel-breakout-relay



    Additional Information:
    I do apologize for leaving out the parts list.
    Leadshine MX4660 4-Axis Digital Stepper Motor Driver
    Ethernet SmoothStepper
    YL600-2S-2K20 VFD
    4 Relay control board
    Has anyone had any success getting Mach3 to control the spindle speed and direction?

    Click the link to add information to this solution:
    I have the 2.2KW VFD. I would like to have it controlled through software. What are the Mode parameters that need to be changed that will allow FWD/ REV, START/STOP and RPM control?

  • BUILDING ONE OF YOUR GREENBULL 6X LONG AND 2.2 KILOWATT SPINDLE DOES NOT FIT. SEEMS LEAD SCREW YOU SENT WITH KIT IS SHORT 42" LOOKS LIKE IT NEEDS TO BE 5 OR 6 INCH LONGER. THIS CORRECT? WHAT THE NEEDED LENGTH FOR UNIT?
  • HI, I HAVE INTENTION OF PURCHASING YOUR 1/2 INCH PRECISION LEAD SCREW SET TO BUILD MY CNC MACHINE, COULD THE SCHEMATIC DIMENSION ANTI-BACKLASH NUT, BEARING FOR AND SHIM? ALSO IS 2.2KW SPINDLE ABLE MILL ALUMINUM WHAT ACCURACY?

    BYCNC response:

    Milling aluminum is no problem with our machines.

    Here is a video we recently did with our 4'x8' machine. The aluminum piece is about 1/4" thick: https://buildyourcnc.com/tutorials/tutorial-greenbull-aluminum-cutting

    The accuracy you will see from our our 2.2kW spindle is entirely dependent on the precision of your build, so it's not possible to say what level of accuracy you can achieve without an examination of the complete system. However, our spindles have a runout of less than .0001 in, which includes the collets that we sell. If you use a collet from another manufacturer, we cannot guarantee this TIR (Total Indicated Runout) dimension.

    For the dimension drawing of the anti-backlash nut, please contact us directly by phone or email to techsupport@buildyourcnc.com

    User response:
    I have emailed waiting for your reply.

    User response:
    Hi, I am still waiting for your email reply.

    BYCNC response:
    Your email has been sent.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    HI, I HAVE INTENTION OF PURCHASING YOUR 1/2 INCH PRECISION LEAD SCREW SET TO BUILD MY CNC MACHINE, COULD THE SCHEMATIC DIMENSION ANTI-BACKLASH NUT, BEARING FOR AND SHIM? ALSO IS 2.2KW SPINDLE ABLE MILL ALUMINUM WHAT ACCURACY?

  • HI, I HAVE INTENTION OF PURCHASING YOUR 1/2 INCH PRECISION LEAD SCREW SET TO BUILD MY CNC MACHINE, COULD THE SCHEMATIC DIMENSION ANTI-BACKLASH NUT, BEARING FOR AND SHIM? ALSO IS 2.2KW SPINDLE ABLE MILL ALUMINUM WHAT ACCURACY?

    BYCNC response:

    Milling aluminum is no problem with our machines.

    Here is a video we recently did with our 4'x8' machine. The aluminum piece is about 1/4" thick: https://buildyourcnc.com/tutorials/tutorial-greenbull-aluminum-cutting

    The accuracy you will see from our our 2.2kW spindle is entirely dependent on the precision of your build, so it's not possible to say what level of accuracy you can achieve without an examination of the complete system. However, our spindles have a runout of less than .0001 in, which includes the collets that we sell. If you use a collet from another manufacturer, we cannot guarantee this TIR (Total Indicated Runout) dimension.

    For the dimension drawing of the anti-backlash nut, please contact us directly by phone or email to techsupport@buildyourcnc.com

    User response:
    I have emailed waiting for your reply.

    User response:
    Hi, I am still waiting for your email reply.

    BYCNC response:
    Your email has been sent.

    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:



    Additional Information:

    Click the link to add information to this solution:
    HI, I HAVE INTENTION OF PURCHASING YOUR 1/2 INCH PRECISION LEAD SCREW SET TO BUILD MY CNC MACHINE, COULD THE SCHEMATIC DIMENSION ANTI-BACKLASH NUT, BEARING FOR AND SHIM? ALSO IS 2.2KW SPINDLE ABLE MILL ALUMINUM WHAT ACCURACY?

Get Help with:
This Product
Orders
Tech Support
Sales
This Product
Order Query
Tech Support
Sales
Not logged in. Log In Register
Track Order(s)
View Order(s)
I Want to Schecule a One-On-One Paid Tech Support Session
Book an Appointment Pertaining to a BuildYourCNC Product (Free)
Ask a Quesion Below (Free):
Book an Appointment Pertaining Other Equipment ($60/half hour)
Book an Immedite Appointment Pertaining Other Equipment ($120/half hour)
Ask a Quesion Below (Free):
Waiting for response... I may not answer immediately, but I was notified on my cellular phone so my response is forthcoming. If I don't respond immediately, you can always go to the [My Account] page to see all of our chats at any time.